Technical Service
Flow & Activity
![]()
Feasibility Study
- Estimate package size ( Accuracy : ~ 90%)
- - Basic Rule : Design rule / Process Rule / Ball Count
- Pre-Simulation (1) : Tj_max estimation, SI Design Constraint Review, Power/Ground Planning
Initial Package Design (Specification Determination)
- Fix ball map & bump map , Define package size & Package Design( Accuracy : ~ 99%)
- Pre-Simulation (2) : Power/Ground Planning, Delay Estimation, Thermal Simulation (Macro-Model)
Package Design (Development Stage)
- Finalize package design for manufacturing
- Post-Simulation : SI/PI simulation for Verification, Detail Thermal Simulation