Download Manual

Specs

AM071FNMDEH (AM071FNMDEH/EU)

Features
  • Type MSP DUCT
Model Name
  • Indoor Unit AM071FNMDEH/EU
Power Supply (Indoor Unit) [Φ, #, V, Hz]
1,2,220-240,50
System
  • Mode HP/HR
Capacity
  • Cooling [kW] 7.10 kW
  • Cooling [Btu/h] 24,200 Btu/h
Power Input (Nominal)
  • Cooling 1) [W] 190.00 W
Current Input (Nominal)
  • Cooling 1) 1.25 A
Fan
  • Type Sirocco Fan
  • Motor (Output) [W] 124 x 1 W
  • Air Flow Rate (High / Mid / Low) [CMM] 18.50/17.00/15.50 CMM
  • Air Flow Rate(High/Mid/Low)[L/S] 308.33/283.33/258.33
  • External Static Pressure (Min / Std / Max) [mmAq] 0.00/4.00/8.00 mmAq
  • External Static Pressure (Min / Std / Max) [Pa] 0.00/39.23/78.45 Pa
Piping Connections
  • Liquid Pipe (Φ, mm) 9.52 mm
  • Liquid Pipe (Φ, inch) 3/8"
  • Gas Pipe (Φ, mm) 15.88 mm
  • Gas Pipe (Φ, inch) 5/8"
  • Drain Pipe (Φ,mm) VP25 (OD 32,ID 25)
Field Wiring
  • Power Source Wire 1.5 ~ 2.5
  • Transmission Cable 0.75 ~ 1.50
Refrigerant
  • Type R410A(Fluorinated greenhouse gas)
  • Control Method EEV INCLUDED
Sound
  • Sound Pressure (High / Mid / Low) [dB(A)] 39.0/35.0/31.0 dBA
  • Sound Power 61.0 dBA
External Dimension (Indoor Unit)
  • Net Weight(kg) 29.00 kg
  • Shipping Weight (kg) 33.00 kg
  • Net Dimensions (WxHxD) (mm) 900 x 260 x 480 mm
  • Shipping Dimensions (WxHxD) (mm) 1170 x 340 x 595 mm
Additional Accessories
  • Drain Pump MDP-M075SGU3D

Need more help? Contact Us.

Online

Live Chat

Monday to Friday (Excluding Public Holidays)
9:00am - 7:00pm

Email

We'll respond within 24 hours of your request.

Email to CEO

Contact the dedicated CEO's Office.

Call

1800-4252997For Mobile Device and Samsung Apps Enquiries

+65 69161260From Oversea

1800-7267864For other Products Enquiries

+65 69161261From Oversea

Monday to Sunday (Including Public Holidays)
8:00am - 8:00pm

* For any printer related enquiries, please visit HP website .

Face-to-face support

Samsung Service Centres

Find out more about how you can get face-to-face help.

Samsung Customer Service Centre @ Westgate will be closed for renovation works from 07 January 19 to 08 February 19. Operation will resume on 09 February 19 at 11:00am. We apologize for any inconvenience caused.